- OP
- Production order: the document that says what is made, with which recipe and routing, and that accumulates consumption, output, times and costs.
- RMP
- Raw material receipt: the gatehouse and lab document that weighs, analyzes and settles the harvest, animals or catch.
- MRP
- Material requirements planning: what to buy or make and when, from sales orders, forecast, stock, reservations and rules.
- RCCP
- Rough-cut capacity planning: hours required against hours available per work center and week, with a traffic-light indicator.
- FEFO
- First-expired, first-out: the rule the system uses to suggest which lot to consume.
- CCP
- Critical control point: a test that, if it fails, puts the product at risk; it is recorded and signed in the moment.
- COA
- Certificate of analysis: the PDF with a lot's lab results, handed to the customer.
- IAS 2
- International accounting standard for inventories: how output is valued, what goes to cost and what goes to expense.
- Overhead
- Manufacturing overhead: energy, machines and plant expenses applied to each order at a rate per work center.
- NRV
- Net realizable value: selling price minus the costs to sell; used to value by-products.
- WIP
- Work in process: the order's "bucket" where materials, labor and overhead accumulate until completion.
- ETO / MTO
- Engineer-to-order / make-to-order: the order is created from the sales order or the project and can have its own recipe.
- ECO
- Engineering change order: a new version of the order's recipe with a reason and line-by-line differences.
- BOM
- Bill of materials: the recipe of an assembly, with its components, subassemblies and quantities.
- GS1-128, GTIN, SSCC
- Logistics barcode; 14-digit product code; unique code of each case or pallet.
- INVIMA, NSO, ICA
- Health regulator; mandatory sanitary notification (cleaning products and cosmetics); agricultural authority.